Loading...
Close

Full Displacement Parts

THE NEATEST SOLUTION FOR CIVIL ENGINEERING

To establish a full displacement pile, a steel tube with a full displacement unit is brought into the ground. The full displacement part is equipped with a “lost tip” or with a cover plate. The soil is fully displaced during drilling of the tube into the ground. After the final depth is achieved, cement is then pumped into the drilling tube. While pulling the drilling tube with feed motion, concrete is pumped into the ground to make a neat and smooth pile.

Vollverdra¦ênger8